EEAgentur.chEEAgentur.ch
EFFEL
The programmeEFFEL for companies
Measures
Standardised measuresNon-standardised measuresFunding check
FAQAbout usContactFunding checkRegister as a utility
ImprintPrivacySitemap
EEAgenturEEAgentur
The programmeEFFEL for companies
Standardised measuresNon-standardised measuresFunding check
FAQAbout usContact
Switch language
deGermanenEnglishfrFrenchitItalian
Funding check
EEAgentur

EEAgentur is a service of Energieagentur St.Gallen. We make efficiency measures eligible for the EFFEL programme and match them with electricity suppliers.

energieagentur-sg.ch ↗bfe.admin.ch ↗

Programme

  • The programme
  • EFFEL for companies

Measures

  • Standardised measures
  • Non-standardised measures
  • Funding check
  • Register as a utility

Agency

  • FAQ
  • About us
  • Contact

Legal

  • Imprint
  • Privacy
  • Sitemap
© 2026 Energieagentur St.Gallen
GermanEnglishFrenchItalian
EFFEL · Efficiency gains through electricity suppliers · Art. 46b EnG

SFOE standard catalogue

Which measures are eligible in the EFFEL programme?

Every currently eligible standard measure in the EFFEL programme (Art. 46b EnG) from the SFOE catalogue in one place. We map your project, calculate the eligible savings, and prepare the documentation for the utility.

Start funding checkMore about the EFFEL programme
37 measures in 11 categories
Replacement, operational optimisation and retrofit
Fixed coefficients
The funding amount follows the SFOE catalogue, not our estimate.

All 37 eligible measures

37 measures

CodeMeasureTypeMeasure
LightingBE · 4 measures
BE-01aReplacement of Indoor Lighting SystemsReplacement
BE-01bOptimization of Existing Indoor Lighting SystemsOperational Optimization
BE-02aReplacement of Street Lighting SystemsReplacement
BE-03aReplacement of Lighting Systems for Tennis and/or Football FieldsReplacement
Commercial EquipmentGG · 4 measures
GG-01aReplacement of Commercial Plug-in Refrigeration and Freezer UnitsReplacement
GG-02aReplacement of Commercial DishwashersReplacement
GG-03aReplacement of Commercial Laundry EquipmentReplacement
GG-04aReplacement of Commercial Ice MakersReplacement
Household AppliancesHG · 1 measures
HG-01aReplacement of Household AppliancesReplacement
Motors and DrivesMO · 2 measures
MO-01aReplacement of Drive Systems up to 75 kWReplacement
MO-02aModernization of Elevators in BuildingsReplacement
PumpsPU · 3 measures
PU-01aSimple Replacement of Water Pump Systems with Constant Speed up to 75 kWReplacement
PU-01bAddition of VFD for Water Pump Systems with Constant Speed up to 75 kWRetrofit
PU-01cResizing of Water Pump Systems with Constant Speed up to 75 kWReplacement
VentilationLU · 2 measures
LU-01aReplacement of Ventilation SystemsReplacement
LU-01bOperational Optimization of Ventilation SystemsOperational Optimization
Compressed AirDL · 2 measures
DL-01aReplacement of Compressed Air Compressors up to 250 kWReplacement
DL-02aOperational Optimization of Compressed Air NetworksOperational Optimization
Refrigeration TechnologyKA · 9 measures
KA-01aReplacement of Air Conditioning Units up to 12 kW in Non-Residential SpacesReplacement
KA-02aReplacement of Cooling Products up to 250 kWReplacement
KA-03aCleaning of Condensers and RecoolersOperational Optimization
KA-03bControl of Minimum Condensing TemperatureOperational Optimization
KA-03cReduction of Condenser Air Short-CircuitsRetrofit
KA-04aCleaning of Air CoolersOperational Optimization
KA-04bAdjustment of Operating TemperatureOperational Optimization
KA-04cAdjustment of SuperheatOperational Optimization
KA-05aAdjustment of Operating HoursOperational Optimization
Heating TechnologyHZ · 5 measures
HZ-01aReplacement of Electric Water Heaters in BuildingsReplacement
HZ-02aReplacement of Circulation Pumps for Heating Groups in BuildingsReplacement
HZ-02bReplacement of Hot Water Circulation Pumps in BuildingsReplacement
HZ-03aReplacement of Decentralized Electric Heating by Air Conditioning Units in Residential BuildingsReplacement
HZ-03bRetrofitting of Remote Control for Heating in Second and Holiday HomesRetrofit
ICTIK · 4 measures
IK-01aReplacement of Electronic and ICT EquipmentReplacement
IK-02aOutsourcing of IT Infrastructure to an External Data CenterOperational Optimization
IK-03aOptimization of UPS Redundancies in Data CentersOperational Optimization
IK-03bOptimization of Supply Air Temperature in Data CentersOperational Optimization
Power SupplySV · 1 measures
SV-01aReplacement of Uninterruptible Power Supply (UPS) SystemsReplacement
Lighting · 4
Replacement of Indoor Lighting SystemsBE-01aReplacementOptimization of Existing Indoor Lighting SystemsBE-01bOperational OptimizationReplacement of Street Lighting SystemsBE-02aReplacementReplacement of Lighting Systems for Tennis and/or Football FieldsBE-03aReplacement
Commercial Equipment · 4
Replacement of Commercial Plug-in Refrigeration and Freezer UnitsGG-01aReplacementReplacement of Commercial DishwashersGG-02aReplacementReplacement of Commercial Laundry EquipmentGG-03aReplacementReplacement of Commercial Ice MakersGG-04aReplacement
Household Appliances · 1
Replacement of Household AppliancesHG-01aReplacement
Motors and Drives · 2
Replacement of Drive Systems up to 75 kWMO-01aReplacementModernization of Elevators in BuildingsMO-02aReplacement
Pumps · 3
Simple Replacement of Water Pump Systems with Constant Speed up to 75 kWPU-01aReplacementAddition of VFD for Water Pump Systems with Constant Speed up to 75 kWPU-01bRetrofitResizing of Water Pump Systems with Constant Speed up to 75 kWPU-01cReplacement
Ventilation · 2
Replacement of Ventilation SystemsLU-01aReplacementOperational Optimization of Ventilation SystemsLU-01bOperational Optimization
Compressed Air · 2
Replacement of Compressed Air Compressors up to 250 kWDL-01aReplacementOperational Optimization of Compressed Air NetworksDL-02aOperational Optimization
Refrigeration Technology · 9
Replacement of Air Conditioning Units up to 12 kW in Non-Residential SpacesKA-01aReplacementReplacement of Cooling Products up to 250 kWKA-02aReplacementCleaning of Condensers and RecoolersKA-03aOperational OptimizationControl of Minimum Condensing TemperatureKA-03bOperational OptimizationReduction of Condenser Air Short-CircuitsKA-03cRetrofitCleaning of Air CoolersKA-04aOperational OptimizationAdjustment of Operating TemperatureKA-04bOperational OptimizationAdjustment of SuperheatKA-04cOperational OptimizationAdjustment of Operating HoursKA-05aOperational Optimization
Heating Technology · 5
Replacement of Electric Water Heaters in BuildingsHZ-01aReplacementReplacement of Circulation Pumps for Heating Groups in BuildingsHZ-02aReplacementReplacement of Hot Water Circulation Pumps in BuildingsHZ-02bReplacementReplacement of Decentralized Electric Heating by Air Conditioning Units in Residential BuildingsHZ-03aReplacementRetrofitting of Remote Control for Heating in Second and Holiday HomesHZ-03bRetrofit
ICT · 4
Replacement of Electronic and ICT EquipmentIK-01aReplacementOutsourcing of IT Infrastructure to an External Data CenterIK-02aOperational OptimizationOptimization of UPS Redundancies in Data CentersIK-03aOperational OptimizationOptimization of Supply Air Temperature in Data CentersIK-03bOperational Optimization
Power Supply · 1
Replacement of Uninterruptible Power Supply (UPS) SystemsSV-01aReplacement

SFOE standard catalogue

How we help

  1. 1

    You describe

    You provide us with the measure-specific information.

  2. 2

    We match

    We map it to a catalogue entry and check exclusion criteria.

  3. 3

    You receive the estimate

    You get an estimate of eligible kWh, proof requirements, and – on request – a ready-to-file package.

Note: Final funding depends on the official coefficients, operating hours, and proofs in the current standard catalogue.

Part of the EFFEL programme

Standardised measures are one of two measure types in the EFFEL programme (efficiency improvements by electricity suppliers, Art. 46b EnG). They follow a predefined SFOE catalogue with fixed savings values.

More about the EFFEL programme

Ready for the funding check?

Send us the essentials of your measure or book a short call – we will respond with an assessment and the right checklist.

Submit measure

You might also be interested in

EFFEL programmeWhat the efficiency obligation for electricity suppliers (Art. 46b EnG) means – deadlines, obligations and eligible measures.Non-standardised measuresIndividual projects in the EFFEL programme that depart from the standard catalogue.