Your estimate
DL-02a · Operational Optimization of Compressed Air Networks
- Example from the catalogue
- ≈ 21’900 kWh
- Contribution at 5 Rp./kWh
- ≈ CHF 1’095
- Status
- Planned
- Exclusion criteria
- 4 open
Reference value from the SFOE catalogue, cumulated over the lifetime. The figure becomes binding after we review your key figures and your utility's tariff.
Example: Leakage analysis and remediation: A leakage analysis is carried out for an 8 bar compressed air network and a leakage quantity of 250 l/min is found and remedied. The full load hours are 6,000 h/a with an annual electricity consumption of 150,000 kWh/a.
Why we ask about status
Whether a measure can still be credited depends on how far it has progressed. The earlier you ask, the safer the contribution.
Why "unsure" is a good answer
An open target agreement we clarify with one call. A wrong answer costs the whole contribution later.