Funding check · free and without obligation

Get your project funded

Describe your measure in five steps. We check eligibility, estimate the contribution and match you with the right utility.

EEAgentur

EEAgentur is a service of Energieagentur St.Gallen. We make efficiency measures eligible for the EFFEL programme and match them with electricity suppliers.

energieagentur-sg.ch ↗bfe.admin.ch ↗

Programme

  • The programme
  • EFFEL for companies

Measures

  • Standardised measures
  • Non-standardised measures
  • Funding check
  • Register as a utility

Agency

  • FAQ
  • About us
  • Contact

Legal

  • Imprint
  • Privacy
  • Sitemap
© 2026 Energieagentur St.GallenEFFEL · Efficiency gains through electricity suppliers · Art. 46b EnG
1

Your measure

Pick from the SFOE catalogue. The remaining fields follow from it.

2

Scope

Key figures for measure DL-01a. Estimates are fine for the initial review.

kW
kWh / a

Optional. Without a measurement we use the full-load hours of the operating mode.

CHF

Optional, per quotation

3

Exclusion criteria

Double funding cannot be undone afterwards. Better to clarify now.

Required by law

Federal law or MuKEn 2014

Financial aid from federal, cantonal or municipal bodies

Received or applied for

Electricity-intensive end consumer

Eligible for grid surcharge refund

Part of a target agreement

EnAW, act or cantonal

Your estimate

DL-01a · Replacement of Compressed Air Compressors up to 250 kW

Example from the catalogue
≈ 168’800 kWh
Contribution at 5 Rp./kWh
≈ CHF 8’440
Status
Planned
Exclusion criteria
4 open

Reference value from the SFOE catalogue, cumulated over the lifetime. The figure becomes binding after we review your key figures and your utility's tariff.

Example: Single compressor replacement (flat-rate approach): A 30 kW compressed air compressor is replaced without analysis and electricity consumption is estimated using the table (2-shift operation, 150,000 kWh/a).

Why we ask about status

Whether a measure can still be credited depends on how far it has progressed. The earlier you ask, the safer the contribution.

Why "unsure" is a good answer

An open target agreement we clarify with one call. A wrong answer costs the whole contribution later.

4

Location and electricity supplier

Your supplier pays preferentially, others are possible too.

Optional. Not sure? Leave empty.

5

Contact and documents

Documents speed up the review but are not required.

Switzerland

PDF, JPG or PNG, up to 10 MB in total · optional

Initial review within two working days, free of charge.